Project details

Palisade Fencing

 

The Challenge

Daventry Metal Products, a long-standing client of Aaron Fencing, returned to us with a new requirement: create a secure compound for their waste disposal area and adjust existing infrastructure to protect the fencing.

The job involved:

Installing a green palisade fencing compound.

Carefully removing and re-installing a crash barrier to shield the new fencing from vehicle impact.

Working efficiently in a live industrial environment.

 

Our Solution

Having previously installed their boundary fencing, our team was already familiar with the site layout. This helped us deliver a fast and effective solution:
We constructed a secure palisade compound tailored for waste storage, blending into the site with its green powder-coated finish.
The existing crash barrier was removed with care, repositioned, and reinstalled to provide maximum protection for the new fencing.
All works were completed with minimal disruption to operations.

 

The Result

A clearly defined, secure waste compound that supports site organisation and safety.
Barrier protection ensures long-term durability of the new fencing.
A repeat customer satisfied once again with our attention to detail and site understanding.

Client details

Daventry Metal Products

Location

Daventry, Northamptonshire

Sector

Industrial/Manufacturing

Service Provided

Green Palisade Compound & Crash Barrier Reconfiguration